Cayuga 138 MW online H2 2026
Company: TeraWulf - Project: Cayuga Site
The claim, verbatim
TeraWulf expects 138 MW of low-cost, predominantly zero-carbon power at Cayuga to be ready for service and come online in the second half of 2026.
Source (primary)
terawulf 8-K exhibit (tm2523008d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-06)Live source ↗
Quote: “With 138 MW expected to come online in the second half of 2026”
How we checked this
Checked on October 8, 2026. The cited source supports every part of this claim.
The release describes 138 MW of low-cost, predominantly zero-carbon power expected to be ready for service in 2026. TeraWulf's Chief Strategy Officer is quoted saying it is expected to come online in the second half of 2026.
Confirmed in the source:
- TeraWulf expects 138 MW of power at Cayuga
- The 138 MW is described as low-cost, predominantly zero-carbon power
- The 138 MW is expected to be ready for service in 2026
- The 138 MW is expected to come online in the second half of 2026
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000110465925078086/tm2523008d1_ex99-1.htm) in full (7,384 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (tm2523008d1_ex99-1.htm)
Quote: “With 138 MW expected to come online in the second half of 2026”