Standard 150 MW AI Factory design
Company: Applied Digital
The claim, verbatim
Standardized AI Factory design, qualified by all major hyperscalers, delivers 150 MW data centers in approximately 14–18 months; spec includes ~907,500 SF, six data halls, 625 W/SF density and 1.15 target PUE.
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-10-03)Live source ↗Archive.org ↗
Quote: “delivering state-of-the-art 150 MW data centers in approximately 14–18 months with low water usage”
How we checked this
Checked on October 4, 2026. The cited source supports every part of this claim.
The business overview slide states the design is qualified by all major hyperscalers and delivers 150 MW data centers in about 14–18 months. The standard design specs slide lists ~907,500 SF, six data halls, 625 W/SF density and a 1.15 target PUE.
Confirmed in the source:
- Applied Digital's standardized AI Factory design is qualified by all major hyperscalers
- The design delivers 150 MW data centers in approximately 14–18 months
- The standard design spec is about 907,500 square feet
- The standard design has six data halls
- The standard design has 625 W/SF density
- The standard design has a 1.15 target PUE
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_dc3803b9c1b927b47c1b631f6696dc2c/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved October 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “delivering state-of-the-art 150 MW data centers in approximately 14–18 months with low water usage”