The 168 MW critical IT load for Fluidstack will be supported by a maximum of 244 MW of gross capacity at Barber Lake.

Source (primary)

cipher-mining 8-K exhibit (dp234624_ex9901.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-01)Live source ↗

Quote: “supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas”

How we checked this

Checked on October 3, 2026. The cited source supports every part of this claim.

The release states that the 168 MW of critical IT load is supported by a maximum of 244 MW of gross capacity at Barber Lake.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9901.htm) in full (12,064 characters, retrieved October 1, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms cipher-mining 8-K exhibit (dp234624_ex9901.htm)

Quote: “supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas”