Fluidstack 10-year HPC colocation agreement at Barber Lake
Company: Cipher Mining - Project: Barber Lake Facility
The claim, verbatim
Cipher signed a 10-year HPC colocation agreement with Fluidstack under which Cipher will deliver 168 MW of critical IT load at its Barber Lake site in Colorado City, Texas.
Source (primary)
cipher-mining 8-K exhibit (dp234624_ex9901.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-01)Live source ↗
Quote: “Under the agreement, Cipher will deliver 168 MW of critical IT load, supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas.”
How we checked this
Checked on October 3, 2026. The cited source supports every part of this claim.
The press release announces the 10-year HPC colocation agreement with Fluidstack. It states that Cipher will deliver 168 MW of critical IT load at Barber Lake in Colorado City, Texas.
Confirmed in the source:
- Cipher signed a 10-year HPC colocation agreement with Fluidstack
- Under the agreement Cipher will deliver 168 MW of critical IT load
- The capacity will be delivered at Cipher's Barber Lake site in Colorado City, Texas
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9901.htm) in full (12,064 characters, retrieved October 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (dp234624_ex9901.htm)
Quote: “Under the agreement, Cipher will deliver 168 MW of critical IT load, supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas.”