1.51 GW critical IT load by 2028
Company: Applied Digital
The claim, verbatim
Expected to deliver 1.51 GW of critical IT load, of which 1.41 GW is fully contracted, with all delivered by 2028; currently 100 MW operational.
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-09-29)Live source ↗Archive.org ↗
Quote: “Expected to deliver 1.51 GW of critical IT load — of which 1.41 GW is already fully contracted — with the majority coming online by 2028. Revenues will ramp and accelerate sharply — today we have just 100 MW operational out of 1.51 GW under construction.”
How we checked this
Checked on September 30, 2026. The cited source supports every part of this claim.
The presentation states these figures directly. The narrative sentence says the 'majority' comes online by 2028, but the campus table says 'All delivered by 2028' and the capacity chart reaches 1,510 MW in 2028.
Confirmed in the source:
- Applied Digital expects to deliver 1.51 GW of critical IT load
- 1.41 GW of that capacity is already fully contracted
- 100 MW is currently operational
- The contracted campuses are all expected to be delivered by 2028, and the capacity chart projects 1,510 MW cumulative by 2028
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_c3878d3eb8fe1eb26f419197a72d4c4b/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved September 29, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “Expected to deliver 1.51 GW of critical IT load — of which 1.41 GW is already fully contracted — with the majority coming online by 2028. Revenues will ramp and accelerate sharply — today we have just 100 MW operational out of 1.51 GW under construction.”