Camp Pendleton 1.1MW FractalGrid microgrid installation
Company: CleanSpark - Project: Camp Pendleton
The claim, verbatim
Installed 1.1MW FractalGrid microgrid system at Marine Corps Base Camp Pendleton
Source (primary)
CleanSpark 10-K filed 2016-12-30 (SEC EDGAR, sec_filing)
View cached copy (2026-09-27)Live source ↗
Quote: “Each individual fractal microgrid can work independently or in concert as the larger 1.1MW FractalGrid”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The filing describes CleanSpark's installation of the 1.1MW FractalGrid at Camp Pendleton. That work was done by CleanSpark as a subcontractor under a grant to Harper Construction, before the public company acquired CleanSpark's assets.
Confirmed in the source:
- A 1.1MW FractalGrid microgrid exists at Marine Corps Base Camp Pendleton
- CleanSpark provided design, development, integration and installation services for the FractalGrid as a subcontractor on a California Energy Commission grant awarded to Harper Construction
- The project was later transferred to CleanSpark
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357716000436/mainbody.htm) in full (178,833 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 10-K filed 2016-12-30
Quote: “Each individual fractal microgrid can work independently or in concert as the larger 1.1MW FractalGrid”