168 MW critical IT capacity at Abernathy
Company: TeraWulf - Project: Abernathy HPC Campus
The claim, verbatim
The Abernathy facility will provide 168 MW of critical IT load capacity under contract
Source (primary)
terawulf 8-K exhibit (tm2529509d1_ex99-3.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “168 MW Critical IT Load Under Contract”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The presentation states 168 MW of critical IT load is under contract at the Abernathy site.
Confirmed in the source:
- The Abernathy facility has 168 MW of critical IT load under contract
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000110465925102858/tm2529509d1_ex99-3.htm) in full (7,331 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (tm2529509d1_ex99-3.htm)
Quote: “168 MW Critical IT Load Under Contract”