Dalton Georgia billable power
Company: Core Scientific
The claim, verbatim
Dalton, Georgia site has approximately 175 MW of billable power as future colocation site
Source (primary)
core-scientific 8-K exhibit (ef20057996_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “Dalton, Georgia Total Billable Power ~175MW”
How we checked this
Checked on September 29, 2026. The cited source supports part of this claim, but not all of it.
The 175 MW figure is correct, but the presentation lists Dalton with Customer status and includes it in the CoreWeave contracted capacity. It is not described as a future colocation site.
Confirmed in the source:
- The Dalton, Georgia site has approximately 175 MW of total billable power
We could not confirm this from the cited source:
- The Dalton, Georgia site is a future colocation site (the presentation labels Dalton as a Customer site included in CoreWeave contracted capacity, not a future colocation site)
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1839341/000114036125039864/ef20057996_ex99-1.htm) in full (11,284 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms core-scientific 8-K exhibit (ef20057996_ex99-1.htm)
Quote: “Dalton, Georgia Total Billable Power ~175MW”