Additional Childress capacity
Company: IREN - Project: Childress
The claim, verbatim
450MW additional capacity available at Childress for potential liquid-cooled AI deployments
Source (primary)
iren 8-K exhibit (ef20058139_ex99-2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “450MW additional capacity available”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The presentation shows 450MW of additional Childress capacity (Horizon 5-10) and describes design work toward a potential conversion of the Childress campus to liquid-cooled AI deployments.
Confirmed in the source:
- Childress has 450MW of additional capacity available
- That capacity is being considered for potential liquid-cooled AI deployments
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036125040072/ef20058139_ex99-2.htm) in full (15,597 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20058139_ex99-2.htm)
Quote: “450MW additional capacity available”