Reveille 70 MW facility
Company: Cipher Mining - Project: Reveille Site
The claim, verbatim
Reveille facility with 70 MW total power capacity on 55 acres is expected to be energized in 2027.
Source (primary)
cipher-mining 8-K exhibit (ciphermining_businessupd.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “70 MW Total Power Capacity Reveille... 2027 Energization: Reveille (70 MW)”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The future pipeline slide lists Reveille at 70 MW on 55 acres, and the timeline lists 2027 energization for Reveille.
Confirmed in the source:
- The Reveille site has 70 MW of total power capacity
- The Reveille site covers 55 acres
- Reveille energization is expected in 2027
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/ciphermining_businessupd.htm) in full (21,477 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (ciphermining_businessupd.htm)
Quote: “70 MW Total Power Capacity Reveille... 2027 Energization: Reveille (70 MW)”