WhiteFiber Continuum July 2026 R&D bandwidth achievement
Company: WhiteFiber
The claim, verbatim
WhiteFiber achieved 111.2 Tbps in July 2026 R&D testing on part of the fiber spectrum for Continuum
Source (primary)
WhiteFiber Continuum Goes Commercial, Scaling Its 83 km Two-Site GPU Supercluster Design to 136 Tbps - StorageReview.com (-, news_article)
View cached copy (2026-09-26)Live source ↗
Quote: “The July R&D result measured 111.2 Tbps on part of the fiber spectrum”
How we checked this
Checked on September 28, 2026. The cited source supports every part of this claim.
The article, dated September 2026, says the July R&D result for the design that became Continuum measured 111.2 Tbps on part of the fiber spectrum.
Confirmed in the source:
- WhiteFiber's July R&D result measured 111.2 Tbps
- The 111.2 Tbps measurement was taken on part of the fiber spectrum
- The July R&D work (Project Redwood) is the design that became Continuum, and the September 2026 article places that July work in 2026
What we did: Read our cached copy of the publisher (https://www.storagereview.com/news/whitefiber-continuum-goes-commercial-scaling-its-83-km-two-site-gpu-supercluster-design-to-136-tbps) in full (10,257 characters, retrieved September 26, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WhiteFiber Continuum Goes Commercial, Scaling Its 83 km Two-Site GPU Supercluster Design to 136 Tbps - StorageReview.com
Quote: “The July R&D result measured 111.2 Tbps on part of the fiber spectrum”