Total contracted powered infrastructure
Company: Core Scientific
The claim, verbatim
Approximately 1,300 contracted MW of powered infrastructure
Source (primary)
December 2024 Convertible Note Presentation (IR page (investors.corescientific.com), ir_presentation)
View cached copy (2026-09-26)Live source ↗Archive.org ↗
Quote: “Approximately 1,300 contracted MW of powered infrastructure”
How we checked this
Checked on November 7, 2026. The cited source supports every part of this claim.
The presentation states 'Approximately 1,300 contracted MW of powered infrastructure,' split as ~900 MW HPC hosting and ~400 MW bitcoin mining, with figures as of 12/1/24.
Confirmed in the source:
- Core Scientific had approximately 1,300 contracted MW of powered infrastructure (as of 12/1/24, per the December 2024 company presentation)
What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_fda3a1f2f1890adaa7ac6c4d9d310971/corescientific/db/1066/11131/pdf/Core_Scientific_December_2024_Company_Presentation.pdf) in full (23,998 characters, retrieved September 26, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms December 2024 Convertible Note Presentation
Quote: “Approximately 1,300 contracted MW of powered infrastructure”
confirms December 2024 Convertible Note Presentation
Quote: “Approximately 1,300 contracted MW of powered infrastructure HPC Hosting | ~900 MW Bitcoin Mining | ~400 MW”
confirms December 2024 Convertible Note Presentation
Quote: “Approximately 1,300 contracted MW of powered infrastructure HPC Hosting | ~900 MW Bitcoin Mining | ~400 MW”
confirms December 2024 Convertible Note Presentation
Quote: “Approximately 1,300 contracted MW of powered infrastructure HPC Hosting | ~900 MW Bitcoin Mining | ~400 MW Over 600 MW Critical IT Load”