Standardized AI factory design and deployment timeline
Company: Applied Digital
The claim, verbatim
150 MW standardized AI factory design qualified by all major hyperscalers, delivering state-of-the-art data centers in 14–18 months with hybrid liquid and air cooling and low water usage
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-09-25)Live source ↗Archive.org ↗
Quote: “delivering state-of-the-art 150 MW data centers in approximately 14–18 months with low water usage... Standardized franchise design model, qualified by all major hyperscalers, enables rapid and flexible deployments in both air-cooled and liquid-cooled configurations”
How we checked this
Checked on September 27, 2026. The cited source supports every part of this claim.
The business overview and standard design specification pages establish the 150 MW design, hyperscaler qualification, 14–18 month delivery, hybrid liquid-plus-air cooling and low water usage.
Confirmed in the source:
- Applied Digital uses a standardized 150 MW AI factory design
- The design model is qualified by all major hyperscalers
- The design delivers data centers in approximately 14–18 months
- The design uses hybrid liquid and air cooling
- The design has low water usage
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_c3b095776b399204354d8f26dbb2553c/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved September 25, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “delivering state-of-the-art 150 MW data centers in approximately 14–18 months with low water usage... Standardized franchise design model, qualified by all major hyperscalers, enables rapid and flexible deployments in both air-cooled and liquid-cooled configurations”