Anthropic 20-year power lease
Company: TeraWulf - Project: Justified Data
The claim, verbatim
TeraWulf signed a 20-year lease with Anthropic for approximately 401 MW at its repurposed aluminum smelter campus
Source (primary)
WULF Stock Rides AI Power Deal And Bullish Wall Street Targets - StocksToTrade (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “TeraWulf has already signed a 20‑year lease with Anthropic for roughly 401 MW at its repurposed aluminum smelter campus.”
How we checked this
Checked on September 25, 2026. The cited source supports every part of this claim.
The article directly states that TeraWulf signed a 20-year lease with Anthropic for roughly 401 MW at its repurposed aluminum smelter campus.
Confirmed in the source:
- TeraWulf signed a lease with Anthropic
- The lease term is 20 years
- The lease covers roughly 401 MW
- The lease is at TeraWulf's repurposed aluminum smelter campus
What we did: Read our cached copy of the publisher (https://stockstotrade.com/news/terawulf-inc-wulf-news-2026_09_17-2/) in full (13,392 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WULF Stock Rides AI Power Deal And Bullish Wall Street Targets - StocksToTrade
Quote: “TeraWulf has already signed a 20‑year lease with Anthropic for roughly 401 MW at its repurposed aluminum smelter campus.”
