Cerebras Systems MTL-3 data center contract
Company: WhiteFiber - Project: MTL-3
The claim, verbatim
Cerebras Systems has contracted to use MTL-3, a 7 gross MW facility with 5 MW IT load, under a 5-year term.
Source (primary)
whitefiber 8-K exhibit (ea030525701ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-15)Live source ↗
Quote: “MTL - 3 7 Gross MW Capacity: 100% operational Customer: Cerebras Systems IT Load: 5 MW Term: 5 years”
How we checked this
Checked on September 23, 2026. The cited source supports every part of this claim.
The data center portfolio slide lists MTL-3 at 7 gross MW with Cerebras Systems as customer, 5 MW IT load and a 5-year term.
Confirmed in the source:
- Cerebras Systems is the customer at MTL-3
- MTL-3 is a 7 gross MW facility
- MTL-3 has 5 MW IT load
- The Cerebras term is 5 years
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/2042022/000121390026099424/ea030525701ex99-1.htm) in full (29,875 characters, retrieved September 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms whitefiber 8-K exhibit (ea030525701ex99-1.htm)
Quote: “MTL - 3 7 Gross MW Capacity: 100% operational Customer: Cerebras Systems IT Load: 5 MW Term: 5 years”