Whinstone Facility power and infrastructure requirements
Company: Riot - Project: Rockdale
The claim, verbatim
The Whinstone Facility requires consistent access to considerable electricity and high-speed internet; anticipated increased demand in electrical power capacity expected
Source (primary)
Riot 10-Q filed 2021-08-23 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “the Whinstone Facility (as defined herein) requires consistent access to a considerable amount of electricity and consistent high-speed Internet connectivity...the anticipated increased demand in electrical power capacity at the Whinstone Facility”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
Both assertions appear in the forward-looking risk factors of the document.
Confirmed in the source:
- The Whinstone Facility requires consistent access to a considerable amount of electricity and consistent high-speed Internet connectivity
- Increased demand in electrical power capacity at the Whinstone Facility is anticipated
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1167419/000107997321000828/riot10qq2-0621.htm) in full (194,179 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Riot 10-Q filed 2021-08-23
Quote: “the Whinstone Facility (as defined herein) requires consistent access to a considerable amount of electricity and consistent high-speed Internet connectivity...the anticipated increased demand in electrical power capacity at the Whinstone Facility”