Whinstone Facility expansion to 700 MW
Company: Riot - Project: Rockdale
The claim, verbatim
Announced expansion of Whinstone Facility by 400 MW, including 200 MW of immersion-cooled infrastructure, to reach 700 MW total capacity
Source (primary)
Riot 10-K filed 2022-03-16 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “After closing the Whinstone Acquisition, we announced a large-scale expansion of the Whinstone Facility by 400 MW, including 200 MW of immersion-cooled Bitcoin mining infrastructure, which is anticipated to bring the Whinstone Facility to 700 MW in total capacity of Bitcoin mining infrastructure.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document states verbatim all three assertions about the Whinstone expansion.
Confirmed in the source:
- Riot announced expansion of the Whinstone Facility by 400 MW
- The expansion includes 200 MW of immersion-cooled infrastructure
- The expansion is anticipated to bring the facility to 700 MW total capacity
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1167419/000107997322000280/riot10k1221.htm) in full (467,403 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Riot 10-K filed 2022-03-16
Quote: “After closing the Whinstone Acquisition, we announced a large-scale expansion of the Whinstone Facility by 400 MW, including 200 MW of immersion-cooled Bitcoin mining infrastructure, which is anticipated to bring the Whinstone Facility to 700 MW in total capacity of Bitcoin mining infrastructure.”
