Texas facility LOI for 200MW wind power
Company: Applied Digital - Project: Garden City
The claim, verbatim
Letter of intent entered on November 24, 2021 to develop facility in Texas with 200MW of wind power
Source (primary)
Applied Digital 424B3 filed 2022-04-13 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “On November 24, 2021, we entered into a letter of intent to develop a facility in Texas with 200MW of wind power.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document confirms the November 24, 2021 LOI for a 200MW wind-powered Texas facility.
Confirmed in the source:
- A letter of intent was entered on November 24, 2021 to develop a Texas facility with 200MW of wind power
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000110465922045567/tm2124821-27_424b3.htm) in full (539,816 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 424B3 filed 2022-04-13
Quote: “On November 24, 2021, we entered into a letter of intent to develop a facility in Texas with 200MW of wind power.”