Rockdale Facility 400 MW expansion completion
Company: Riot - Project: Rockdale
What the later record shows
Delivered; the record does not say when
A December 2025 prospectus says the roughly 400 MW Rockdale expansion was finalized, bringing capacity to 700 MW. The 10-K shows 630 MW at end-2022 and 700 MW at end-2023, so it was done during 2023. No passage says whether that was by March 31, 2023.
“Developed power capacity (MW) (3) Rockdale Facility 700 700 630”
2025-02-27 · Riot 10-K filed 2025-02-28 View cached copy (2026-08-31)Live source ↗
“we have finalized our expansion and added approximately 400 MW to the Rockdale Facility, bringing its total developed capacity to 700 MW of electrical power”
2025-12-30 · Riot 424B5 filed 2025-12-31 View cached copy (2026-08-31)Live source ↗
Checked October 9, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
The 400 MW expansion at the Rockdale Facility will be finalized with completion of the fourth building in the first quarter of 2023
Source (primary)
Riot 10-K filed 2023-03-02 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “our 400 MW expansion at the Rockdale Facility... We also completed construction of three new buildings in 2022, and a fourth is nearing completion in the first quarter of 2023, which, when completed, will finalize our Rockdale Facility expansion.”
How we checked this
Checked on October 11, 2026. The cited source supports every part of this claim.
The 10-K's Data Center Hosting discussion describes the 400 MW expansion and says the fourth building, nearing completion in Q1 2023, will finalize it. The filing describes Q1 2023 completion as expected, not achieved.
Confirmed in the source:
- Riot was carrying out a 400 MW expansion at the Rockdale Facility
- Three new buildings were completed in 2022 and a fourth was nearing completion in the first quarter of 2023
- Completing the fourth building will finalize the Rockdale Facility expansion
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1167419/000155837023002704/riot-20221231x10k.htm) in full (577,023 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Riot 10-K filed 2023-03-02
Quote: “our 400 MW expansion at the Rockdale Facility... We also completed construction of three new buildings in 2022, and a fourth is nearing completion in the first quarter of 2023, which, when completed, will finalize our Rockdale Facility expansion.”
confirms Riot 10-K filed 2025-02-28
Quote: “Developed power capacity (MW) (3) Rockdale Facility 700 700 630”
confirms Riot 424B5 filed 2025-12-31
Quote: “we have finalized our expansion and added approximately 400 MW to the Rockdale Facility, bringing its total developed capacity to 700 MW of electrical power”
