Marble 1 facility power capacity
Company: Core Scientific - Project: Marble
The claim, verbatim
Operates Marble 1 facility in Marble, North Carolina at power capacity up to 35 MW under Industrial Power Contract with Murphy Electric Power Board originally executed December 15, 2017
Source (primary)
Core Scientific 10-K filed 2023-04-04 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Company currently operates its "Marble 1" facility in Marble, North Carolina at a power capacity up to 35,000 kW under an Industrial Power Contract (the "Murphy IPC") originally executed on December 15, 2017 with Murphy Electric Power Board”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document confirms the Marble 1 capacity, the Murphy Electric Power Board contract, and the December 15, 2017 execution date.
Confirmed in the source:
- Marble 1 facility in Marble, North Carolina operates at power capacity up to 35,000 kW
- Operated under an Industrial Power Contract with Murphy Electric Power Board
- The contract was originally executed on December 15, 2017
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1839341/000162828023010454/core-20221231.htm) in full (860,799 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific 10-K filed 2023-04-04
Quote: “The Company currently operates its "Marble 1" facility in Marble, North Carolina at a power capacity up to 35,000 kW under an Industrial Power Contract (the "Murphy IPC") originally executed on December 15, 2017 with Murphy Electric Power Board”