Murphy Electric Power Board supply agreement
Company: Core Scientific - Project: Marble
The claim, verbatim
Industrial Power Contract with Murphy Electric Power Board for Marble 1 facility, originally executed December 15, 2017
Source (primary)
Core Scientific 10-K filed 2023-04-04 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “Industrial Power Contract (the "Murphy IPC") originally executed on December 15, 2017 with Murphy Electric Power Board (the "MEPB")”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states the Murphy IPC was originally executed December 15, 2017 with Murphy Electric Power Board.
Confirmed in the source:
- The Industrial Power Contract with Murphy Electric Power Board for the Marble 1 facility was originally executed on December 15, 2017
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1839341/000162828023010454/core-20221231.htm) in full (860,799 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific 10-K filed 2023-04-04
Quote: “Industrial Power Contract (the "Murphy IPC") originally executed on December 15, 2017 with Murphy Electric Power Board (the "MEPB")”