Pecos 300 MW conditional studied load status
Company: Core Scientific - Project: Cottonwood
The claim, verbatim
300 MW at Pecos received conditional studied load status under ERCOT Batch Zero
Source (primary)
Core Scientific Gets Conditional ERCOT Status for 1 GW at Texas Sites - theminermag.com (-, news_article)
View cached copy (2026-09-11)Live source ↗Archive.org ↗
Quote: “Another 300 megawatts received conditional 'Studied Load' status.”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states the 300 MW received conditional Studied Load status within the ERCOT Batch Zero grid-review process it describes throughout.
Confirmed in the source:
- 300 MW at Pecos received conditional studied load status under the ERCOT Batch Zero process
What we did: Read our cached copy of the publisher (https://theminermag.com/news/market-news/core-scientific-ercot-power-texas-ai-data-centers) in full (4,919 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific Gets Conditional ERCOT Status for 1 GW at Texas Sites - theminermag.com
Quote: “Another 300 megawatts received conditional 'Studied Load' status.”
