Denton 297 MW Base Load capacity approved
Company: Core Scientific - Project: Denton
The claim, verbatim
297 MW at Denton deemed Base Load Pathway (a) as energized before March 25, 2022 and excluded from Batch Zero
Source (primary)
Core Scientific wins conditional ERCOT power approvals for Texas data centers - TradingView (-, news_article)
View cached copy (2026-09-11)Live source ↗Archive.org ↗
Quote: “Denton: 297 MW deemed Base Load Pathway (a) as energized before Mar 25, 2022 and excluded from Batch Zero”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states verbatim that Denton's 297 MW was deemed Base Load Pathway (a), energized before Mar 25, 2022, and excluded from Batch Zero.
Confirmed in the source:
- Core Scientific's Denton facility has 297 MW deemed Base Load Pathway (a)
- The 297 MW was energized before March 25, 2022
- The 297 MW is excluded from Batch Zero
What we did: Read our cached copy of the publisher (https://www.tradingview.com/news/tradingview:b55357bd92728:0-core-scientific-wins-conditional-ercot-power-approvals-for-texas-data-centers/) in full (3,369 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific wins conditional ERCOT power approvals for Texas data centers - TradingView
Quote: “Denton: 297 MW deemed Base Load Pathway (a) as energized before Mar 25, 2022 and excluded from Batch Zero”