Denton facility 297 MW existing capacity

Company: Core Scientific - Project: Denton

Subject kind
facility capacity
Statement date
2026-09-10
Promised amount
297.0 MW
Current status
stated

The claim, verbatim

297 megawatts of existing power received conditional recognition as longstanding base load

Source (primary)

Core Scientific Gets Conditional ERCOT Status for 1 GW at Texas Sites - theminermag.com (-, news_article)
View cached copy (2026-09-11)Live source ↗Archive.org ↗

Quote: “297 megawatts of existing power received conditional recognition as longstanding base load because the facility was energized before March 25, 2022”

How we checked this

Checked on September 20, 2026. The cited source supports every part of this claim.

The document states verbatim that Denton's 297 MW of existing power received conditional recognition as longstanding base load.

Confirmed in the source:

What we did: Read our cached copy of the publisher (https://theminermag.com/news/market-news/core-scientific-ercot-power-texas-ai-data-centers) in full (4,919 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Core Scientific Gets Conditional ERCOT Status for 1 GW at Texas Sites - theminermag.com

Quote: “297 megawatts of existing power received conditional recognition as longstanding base load because the facility was energized before March 25, 2022”