Pecos site - 300 MW Base Load Batch Zero approval
Company: Core Scientific - Project: Cottonwood
The claim, verbatim
300 megawatts of existing power at Pecos site received conditional Batch Zero approval as Base Load, Pathway (b)
Source (primary)
Core Scientific Receives Conditional ERCOT Approvals for Texas Power Capacity - Yahoo Finance (-, news_article)
View cached copy (2026-09-11)Live source ↗Archive.org ↗
Quote: “At Core Scientific's Pecos site, 300 megawatts of existing power received conditional Batch Zero approval as "Base Load, Pathway (b),"”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states verbatim the 300 MW at Pecos received conditional Batch Zero approval as Base Load, Pathway (b).
Confirmed in the source:
- 300 megawatts of existing power at Core Scientific's Pecos site received conditional Batch Zero approval as Base Load, Pathway (b)
What we did: Read our cached copy of the publisher (https://finance.yahoo.com/energy/articles/core-scientific-receives-conditional-ercot-141224402.html) in full (9,430 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific Receives Conditional ERCOT Approvals for Texas Power Capacity - Yahoo Finance
Quote: “At Core Scientific's Pecos site, 300 megawatts of existing power received conditional Batch Zero approval as "Base Load, Pathway (b),"”
