Denton site - 297 MW conditional ERCOT approval
Company: Core Scientific - Project: Denton
The claim, verbatim
297 megawatts of existing electrical power at Denton site received conditional ERCOT approval as Base Load, Pathway (a)
Source (primary)
Core Scientific Receives Conditional ERCOT Approvals for Texas Power Capacity - Yahoo Finance (-, news_article)
View cached copy (2026-09-11)Live source ↗Archive.org ↗
Quote: “At the Denton site, 297 megawatts of existing electrical power received conditional approval as "Base Load, Pathway (a),"”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states verbatim that 297 MW at Denton received conditional approval as Base Load, Pathway (a).
Confirmed in the source:
- 297 megawatts of existing electrical power at Core Scientific's Denton site received conditional ERCOT approval as Base Load, Pathway (a)
What we did: Read our cached copy of the publisher (https://finance.yahoo.com/energy/articles/core-scientific-receives-conditional-ercot-141224402.html) in full (9,430 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific Receives Conditional ERCOT Approvals for Texas Power Capacity - Yahoo Finance
Quote: “At the Denton site, 297 megawatts of existing electrical power received conditional approval as "Base Load, Pathway (a),"”
