Beit Shemesh
Project of Nebius
Where it stands
Mega Or's Beit Shemesh data center, leased to Nebius, is under construction. The facility will have a maximum capacity of 135MW, of which Nebius will take half. The first 58MW phase is leased to Nebius, with fit-out expected this quarter, and completion is targeted for Q2 2028. The new 134MW expansion is split between Beit Shemesh and Masmiya, but the passages do not give the Beit Shemesh share. No capacity is reported as in service yet.
58 MW under construction · 135 MW planned
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Phase 1 (January 2026 lease) | 58 | under construction | The first 58MW phase at the campus is already leased to Nebius under the January 2026 contract, with fit-out expected this quarter. 2026-11-20 View cached copy (2026-11-21)Live source ↗Archive.org ↗ | |
| Expansion (November 2026 lease, shared with Masmiya) | planned | 2028-06-30 | In total, this will increase Nebius' leased capacity from Mega Or by 134MW 2026-11-20 View cached copy (2026-11-21)Live source ↗Archive.org ↗ |
Assessed November 22, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 20, 2026).
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | -- | ||
| Contracted a customer is on the hook | 67.5 MW | 2026-11-20 | Nebius share of Beit Shemesh campus |
| Under construction | -- | ||
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | -- | ||
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | -- |
Who has claimed this site
Capacity commitments in the order they were announced. A commitment that ended shows why.
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-11-23
Beit Shemesh, Israel → 31.74966, 34.98669 (locality) - No site-level evidence yet 2026-11-23
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-11-23
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.