Winfield
Project of CleanSpark
Where it stands
CleanSpark acquired Winfield Technologies LLC, an existing bitcoin mining operating entity in Winfield, TN, under the Third MIPA, closing on September 25, 2024. The site was one of seven operating sites in an 85 MW Tennessee package, but the passages do not give Winfield's own capacity. The November 2025 10-K still lists Winfield among CleanSpark's bitcoin mining facilities; no passage reports a pause, closure or sale.
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 24, 2025).
Site intelligence
How we located this site
- Initial geocode 2026-09-05
Winfield, Tennessee, TN → town/county centre, 4 km box -- not the site - Starting point (the project's stated locality) 2026-10-19
Winfield, Tennessee → 36.55591, -84.45160 (locality) - No site-level evidence yet 2026-10-19
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-10-19
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.