West Crossville
Project of CleanSpark
Where it stands
CleanSpark acquired West Crossville Technologies LLC, an existing bitcoin mining operating entity, from Exponential Digital under MIPA 1, which closed on September 16, 2024. West Crossville's capacity is reported only as part of a combined 25 MW with Jellico, TN, so no separate MW figure is given. The November 2025 10-K still lists West Crossville among the company's bitcoin mining facilities, but no passage gives its current operating status.
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| West Crossville bitcoin mining site (acquired via MIPA 1 with Jellico) | operational | 2024-09-16 | The Company completed the acquisition of MIPA 1 and MIPA 3 on September 16, 2024 and September 25, 2024, respectively. 2024-12-02 View cached copy (2026-08-31)Live source ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 24, 2025).
Claims about this project
Site intelligence
How we located this site
- Initial geocode 2026-09-05
West Crossville, Tennessee, TN → town/county centre, 4 km box -- not the site - Nearest substation (earlier method) 2026-09-05
re-centred on the nearest high-voltage substation (superseded method) - Starting point (the project's stated locality) 2026-10-19
West Crossville, Tennessee → 35.94896, -85.02690 (locality) - No site-level evidence yet 2026-10-19
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-10-19
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.