CleanSpark bought the existing Oneida, TN bitcoin mining facility by acquiring Oneida Technologies LLC under the Third MIPA, which closed on September 25, 2024. The September 2024 8-K gives 40 MW for Oneida and Tazewell together, with no separate Oneida figure, so no site-level MW is assigned. The November 2025 10-K still lists Oneida among the company's bitcoin mining facilities, but no passage directly states its current operating status or capacity.
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Oneida site (acquired via Third MIPA / MIPA 3) | operational | 2024-09-25 | The Company completed the acquisition of MIPA 1 and MIPA 3 on September 16, 2024 and September 25, 2024, respectively. 2024-12-02 View cached copy (2026-08-31)Live source ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 24, 2025).
Site intelligence
How we located this site
- Initial geocode 2026-09-05
Oneida, Tennessee, TN → town/county centre, 4 km box -- not the site - Nearest substation (earlier method) 2026-09-05
re-centred on the nearest high-voltage substation (superseded method) - Starting point (the project's stated locality) 2026-10-19
Oneida, Tennessee → 36.49813, -84.51272 (locality) - No site-level evidence yet 2026-10-19