Hawesville Site acquisition
Company: TeraWulf
The claim, verbatim
TeraWulf entered into an Agreement of Purchase and Sale in February 2026 for a 250+ acre brownfield property in Hawesville, Kentucky with access to high-voltage transmission lines and an energized substation.
Source (primary)
TeraWulf 424B5 filed 2026-04-16 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “In February 2026, we entered into an Agreement of Purchase and Sale for a former industrial site in Hawesville, Kentucky (the "Hawesville Site"). The Hawesville Site is a strategically located brownfield infrastructure site which includes more than 250 buildable acres with immediate access to power infrastructure, including multiple high-voltage transmission lines, an on-site energized substation, and a direct connection to the regional transmission network.”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The filing describes the February 2026 purchase agreement for a brownfield site in Hawesville, Kentucky with more than 250 buildable acres, high-voltage transmission lines and an energized substation.
Confirmed in the source:
- TeraWulf entered into an Agreement of Purchase and Sale in February 2026
- The property is in Hawesville, Kentucky
- The site is a brownfield site with more than 250 buildable acres
- The site has access to multiple high-voltage transmission lines
- The site has an on-site energized substation
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465926044031/tm2611661-8_424b5.htm) in full (226,161 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 424B5 filed 2026-04-16
Quote: “In February 2026, we entered into an Agreement of Purchase and Sale for a former industrial site in Hawesville, Kentucky (the "Hawesville Site"). The Hawesville Site is a strategically located brownfield infrastructure site which includes more than 250 buildable acres with immediate access to power infrastructure, including multiple high-voltage transmission lines, an on-site energized substation, and a direct connection to the regional transmission network.”