Existing data centre energy efficiency specification
Company: TeraWulf
The claim, verbatim
Existing data centres financed will have an operational PUE of 1.45 or below on 12-month rolling average
Source (primary)
TeraWulf Sustainable Finance Framework Second Party Opinion 2025 (IR page (investors.terawulf.com), ir_release)
View cached copy (2026-09-01)Live source ↗
Quote: “Existing, retrofitted and upgraded data centres with a 12-month rolling average operational PUE of 1.45 or below”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The document requires existing, retrofitted and upgraded data centres to have a 12-month rolling average operational PUE of 1.45 or below.
Confirmed in the source:
- Existing data centres eligible for financing must have an operational PUE of 1.45 or below
- The PUE threshold for existing data centres is measured as a 12-month rolling average
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_0c87b48cb4d1c6967968c7d0c3e5933d/terawulf/db/2476/23465/pdf/TeraWulf_Sustainable_Finance_Framework_Second_Party_Opinion_2025.pdf) in full (29,307 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf Sustainable Finance Framework Second Party Opinion 2025
Quote: “Existing, retrofitted and upgraded data centres with a 12-month rolling average operational PUE of 1.45 or below”