jain.com

Contracted critical IT load at Lake Mariner and Abernathy campuses

Company: TeraWulf

This claim was withdrawn on September 3, 2026. The two quoted sentences appear verbatim, but the claim's derived total of 606 MW contradicts the filing, which states the contracted platform totals 522 MW of critical IT load because only TeraWulf's 50.1% attributable share of Abernathy is counted.

How this was decided: Evidence review against the cited source. The claim is preserved below exactly as it was originally published, so the record shows what was asserted as well as what became of it.

Subject kind
facility capacity
Statement date
2026-02-26
Promised amount
606.0 MW
Current status
withdrawn

The claim, verbatim

La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at Lake Mariner Data Campus, and Abernathy HPC Campus is designed for 168 MW critical IT load, totaling 606 MW of contracted capacity

Source (primary)

TeraWulf 10-K filed 2026-02-27 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗

Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus, with some deliveries having commenced in 2025 and others extending into 2026... The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site.”

How we checked this

This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.

Additional evidence

confirms TeraWulf 10-K filed 2026-02-27

Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus, with some deliveries having commenced in 2025 and others extending into 2026... The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site.”

View cached copy (2026-08-31)Live source ↗

Record of changes

September 2, 2026 — stated
Automated extraction from the cited source. Recorded automatically from the cited source when it was published, then queued for evidence review.
September 3, 2026 — withdrawn
Evidence review against the cited source. The two quoted sentences appear verbatim, but the claim's derived total of 606 MW contradicts the filing, which states the contracted platform totals 522 MW of critical IT load because only TeraWulf's 50.1% attributable share of Abernathy is counted.