Contracted critical IT load at Lake Mariner and Abernathy campuses
Company: TeraWulf
The claim, verbatim
La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at Lake Mariner Data Campus, and Abernathy HPC Campus is designed for 168 MW critical IT load, totaling 606 MW of contracted capacity
Source (primary)
TeraWulf 10-K filed 2026-02-27 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus, with some deliveries having commenced in 2025 and others extending into 2026... The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site.”
How we checked this
Checked on September 16, 2026. The cited source supports part of this claim, but not all of it.
The filing states the 438 MW and 168 MW figures individually, but it does not add them to 606 MW; instead it reports the contracted HPC platform as 522 MW of critical IT load, counting only TeraWulf's 50.1% attributable share of Abernathy.
Confirmed in the source:
- La Lupa and Akela together represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus
- The Abernathy HPC Campus is designed for 168 MW of critical IT load, representing the site's full build-out
We could not confirm this from the cited source:
- That the contracted capacity across the two campuses totals 606 MW
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm) in full (490,491 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2026-02-27
Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus, with some deliveries having commenced in 2025 and others extending into 2026... The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site.”