MARA 1 GW potential capacity through 2030
Company: Marathon Digital
The claim, verbatim
MARA plans to develop plus 1 GW of potential power capacity with up to 600 gross MW of Critical IT load and AI through 2030
Source (primary)
MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation (IR page (ir.mara.com), ir_presentation)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “+1 GW of Potential Power Capacity, with 600 Gross MW of Critical IT Load / AI Through 2030”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
A slide is titled '+1 GW of Potential Power Capacity, with 600 Gross MW of Critical IT Load / AI Through 2030'. A footnote says this total includes MARA's existing Hannibal capacity and planned grid and onsite generation expansion.
Confirmed in the source:
- MARA presents more than 1 GW of potential power capacity at the Hannibal, Ohio campus
- Up to 600 gross MW of that capacity is designated for Critical IT load and AI
- The capacity is projected through 2030
What we did: Read our cached copy of IR page (ir.mara.com) (https://d1io3yog0oux5.cloudfront.net/_acac9787cc36f15214b4079363d57bfc/marathondh/db/417/7572/pdf/Project+Leopard+Deck+V2.pdf) in full (19,483 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation
Quote: “+1 GW of Potential Power Capacity, with 600 Gross MW of Critical IT Load / AI Through 2030”