Central Ohio facility capacity
Company: Marathon Digital
The claim, verbatim
Central Ohio grid connected facility contributes 150 MW of capacity
Source (primary)
View 10-K PDF (IR page (ir.mara.com), ir_release)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “In Central Ohio, our grid connected facility contributes an additional 150 MW, further strengthening our overall capacity footprint.”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The 10-K states that MARA's Central Ohio grid-connected facility contributes an additional 150 MW.
Confirmed in the source:
- MARA's Central Ohio grid-connected facility contributes 150 MW of capacity
What we did: Read our cached copy of IR page (ir.mara.com) (https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/0001507605-26-000007.pdf) in full (437,988 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms View 10-K PDF
Quote: “In Central Ohio, our grid connected facility contributes an additional 150 MW, further strengthening our overall capacity footprint.”
