Central Ohio facility capacity
Company: Marathon Digital
The claim, verbatim
Central Ohio grid-connected facility contributes 150 MW of capacity
Source (primary)
Marathon Digital 10-K filed 2026-03-02 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “In Central Ohio, our grid connected facility contributes an additional 150 MW”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The filing states the Central Ohio grid-connected facility contributes an additional 150 MW.
Confirmed in the source:
- MARA's grid-connected Central Ohio facility contributes an additional 150 MW of capacity
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1507605/000150760526000007/mara-20251231.htm) in full (412,365 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Marathon Digital 10-K filed 2026-03-02
Quote: “In Central Ohio, our grid connected facility contributes an additional 150 MW”