Power generation assets divestiture
Company: Hut 8
The claim, verbatim
Divested four power generation assets (Iroquois Falls, Kingston, North Bay, Kapuskasing) totaling approximately 310 MW in Q1 2026
Source (primary)
Hut 8 10-K filed 2026-02-25 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Of this capacity, approximately 310 MW is associated with the four power generation assets we divested in Q1 2026”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The filing states approximately 310 MW was associated with four power generation assets divested in Q1 2026, and its asset table footnotes identify those four sites as Iroquois Falls, Kingston, North Bay, and Kapuskasing.
Confirmed in the source:
- Hut 8 divested four power generation assets in Q1 2026
- The divested portfolio totaled approximately 310 MW
- The four divested assets are Iroquois Falls, Kingston, North Bay, and Kapuskasing
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465926019392/hut-20251231x10k.htm) in full (639,413 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Hut 8 10-K filed 2026-02-25
Quote: “Of this capacity, approximately 310 MW is associated with the four power generation assets we divested in Q1 2026”