Stingray interconnection approval
Company: Cipher Mining
The claim, verbatim
Stingray Site has conditional ERCOT interconnection approval of up to 100 MW
Source (primary)
Cipher Mining 10-K filed 2026-02-24 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Stingray Site has conditional ERCOT interconnection approval of up to 100 MW.”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The filing states Stingray holds conditional ERCOT interconnection approval of up to 100 MW.
Confirmed in the source:
- The Stingray site has conditional ERCOT interconnection approval of up to 100 MW
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm) in full (477,779 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Cipher Mining 10-K filed 2026-02-24
Quote: “The Stingray Site has conditional ERCOT interconnection approval of up to 100 MW.”