2028+ Expansion - Sweetwater and Kiowa
Company: IREN - Project: Kiowa
The claim, verbatim
Additional Sweetwater and Kiowa data center capacity expected to ramp from 2028 as part of 2028+ expansion across 5GW secured power
Source (primary)
iren 8-K exhibit (irenreportsq3fy26results.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-08)Live source ↗
Quote: “2028+ expansion across 5GW secured power underway o Additional Sweetwater and Kiowa data center capacity expected to ramp from 2028”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states the 2028+ expansion across 5GW secured power with additional Sweetwater and Kiowa capacity ramping from 2028.
Confirmed in the source:
- Additional Sweetwater and Kiowa data center capacity is expected to ramp from 2028
- This is part of the 2028+ expansion across 5GW secured power
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000025/irenreportsq3fy26results.htm) in full (30,392 characters, retrieved September 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (irenreportsq3fy26results.htm)
Quote: “2028+ expansion across 5GW secured power underway o Additional Sweetwater and Kiowa data center capacity expected to ramp from 2028”