Canal Flats retrofit capacity plan
Company: IREN - Project: Canal Flats
The claim, verbatim
Retrofitting 30 megawatts of existing air-cooled capacity at Canal Flats to support AI workloads
Source (primary)
iren 8-K exhibit (irentranscript.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-07)Live source ↗
Quote: “We plan to retrofit all 30 megawatts of existing air-cooled capacity to support AI workloads.”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The transcript identifies Canal Flats as the site where all 30 megawatts of air-cooled capacity will be retrofitted for AI workloads.
Confirmed in the source:
- Canal Flats has 30 megawatts of existing air-cooled capacity
- IREN plans to retrofit all 30 megawatts of Canal Flats capacity to support AI workloads
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000028/irentranscript.htm) in full (50,400 characters, retrieved September 7, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (irentranscript.htm)
Quote: “We plan to retrofit all 30 megawatts of existing air-cooled capacity to support AI workloads.”
