Sweetwater 1 substation energization
Company: IREN - Project: Sweetwater 1
The claim, verbatim
Sweetwater 1 high-voltage substation energized on schedule; initial 200 MW liquid-cooled data center phase under construction
Source (primary)
iren 8-K exhibit (irentranscript.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-07)Live source ↗
Quote: “At Sweetwater 1, the high-voltage substation has been energized on schedule and construction is now underway for the initial 200 megawatts IT load phase of liquid-cooled data centers.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (irentranscript.htm)
Quote: “At Sweetwater 1, the high-voltage substation has been energized on schedule and construction is now underway for the initial 200 megawatts IT load phase of liquid-cooled data centers.”
