jain.com

Kentucky Power substation construction

Company: TeraWulf - Project: Muskie Data

Subject kind
partnership
Statement date
2026-05-25
Current status
stated

The claim, verbatim

Kentucky Power, an AEP Company, is constructing a 345 kV substation connected to existing 765 kV transmission network to support Muskie Data Campus

Source (primary)

terawulf 8-K exhibit (wulfeasternkypr5-26x26.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-06)Live source ↗

Quote: “Kentucky Power, an AEP Company, is constructing a 345 kV substation connected to the existing 765 kV transmission network, providing redundant, utility-scale power infrastructure designed to support the full 1+ GW campus.”

How we checked this

Checked on September 19, 2026. The cited source supports every part of this claim.

The document establishes all elements of the substation construction and its purpose.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330126000109/wulfeasternkypr5-26x26.htm) in full (9,820 characters, retrieved September 6, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms terawulf 8-K exhibit (wulfeasternkypr5-26x26.htm)

Quote: “Kentucky Power, an AEP Company, is constructing a 345 kV substation connected to the existing 765 kV transmission network, providing redundant, utility-scale power infrastructure designed to support the full 1+ GW campus.”

View cached copy (2026-09-06)Live source ↗