Capacity under construction
Company: Hut 8 - Project: River Bend
The claim, verbatim
1,330 MW of utility capacity in active construction: 330 MW at River Bend, 1,000 MW at Beacon Point.
Source (primary)
hut-8 8-K exhibit (tm2621890d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-02)Live source ↗
Quote: “1,330 MW of utility capacity in active construction across River Bend and Beacon Point”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states total Energy Capacity Under Construction of 1,330 MW, comprising 330 MW at River Bend and 1,000 MW at Beacon Point.
Confirmed in the source:
- Hut 8 has 1,330 MW of utility capacity in active construction
- 330 MW is at the River Bend campus
- 1,000 MW is at the Beacon Point campus
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000110465926090041/tm2621890d1_ex99-1.htm) in full (23,702 characters, retrieved September 2, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms hut-8 8-K exhibit (tm2621890d1_ex99-1.htm)
Quote: “1,330 MW of utility capacity in active construction across River Bend and Beacon Point”