ERCOT energy consumption approval for Black Pearl Facility
Company: Cipher Mining
The claim, verbatim
Acquiring conditional ERCOT approval for up to 300 MW of energy consumption at the Black Pearl Facility interconnection point
Source (primary)
Cipher Mining 424B5 filed 2023-11-08 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “an approval from the Electric Reliability Council of Texas ("ERCOT") conditionally approving up to 300 MW of energy consumption at the interconnection point of the Leased Property (the "Purchased Assets")”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Cipher Mining 424B5 filed 2023-11-08
Quote: “an approval from the Electric Reliability Council of Texas ("ERCOT") conditionally approving up to 300 MW of energy consumption at the interconnection point of the Leased Property (the "Purchased Assets")”