Company: Hut 8

Subject kind
facility capacity
Statement date
2023-11-08
Promised amount
7.5 EH/s
Current status
stated

The claim, verbatim

Combined installed self-mining capacity of 7.5 exahashes per second across six sites

Source (primary)

Hut 8 424B3 filed 2023-11-09 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗

Quote: “combined installed self-mining capacity of 7.5 exahashes per second (EH/s) and 253 megawatts (MW) of total energy currently available from six sites”

How we checked this

Checked on September 18, 2026. The cited source supports every part of this claim.

The prospectus states that New Hut is expected to benefit from 7.5 EH/s of combined installed self-mining capacity across six sites.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465923116384/tm235928-42_424b3.htm) in full (1,232,285 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Hut 8 424B3 filed 2023-11-09

Quote: “combined installed self-mining capacity of 7.5 exahashes per second (EH/s) and 253 megawatts (MW) of total energy currently available from six sites”