Childress 600MW connection and 20MW data center operational
Company: IREN
The claim, verbatim
Childress's 600MW high voltage connection infrastructure and first 20MW data center (~0.6 EH/s) have been operational since April 2023.
Source (primary)
iren 8-K exhibit (brhc20055660_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-22)Live source ↗
Quote: “The Company’s 600MW high voltage connection infrastructure and first 20MW data center (supporting ~0.6 EH/s) have been operational since April 2023.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (brhc20055660_ex99-1.htm)
Quote: “The Company’s 600MW high voltage connection infrastructure and first 20MW data center (supporting ~0.6 EH/s) have been operational since April 2023.”