500MW available power at Childress for HPC
Company: IREN
The claim, verbatim
The company states it has significant available power for HPC, including 500MW at Childress, assuming the 600MW grid connection and operational bulk power station and excluding Phase 1.
Source (primary)
iren 8-K exhibit (brhc20055660_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-22)Live source ↗
Quote: “Significant available power, including 500MW 3 at Childress”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (brhc20055660_ex99-1.htm)
Quote: “Significant available power, including 500MW 3 at Childress”