Second Beacon Point 352 MW lease filling 1 GW site
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
A second lease of the same 352 MW size fills the 1 GW Beacon Point site.
Source (primary)
Hut 8 and MARA shares plunge as bitcoin slips under $60,000 and AI stocks sell off - Startup Fortune (-, news_article)
View cached copy (2026-11-22)Live source ↗Archive.org ↗
Quote: “with a second lease of the same size that fills the 1 GW site”
How we checked this
Checked on November 23, 2026. The cited source supports every part of this claim.
The article says the 352 MW Beacon Point lease is joined by a second lease of the same size that fills the 1 GW site.
Confirmed in the source:
- Hut 8 has a second Beacon Point lease of the same 352 MW size
- The second lease fills the 1 GW Beacon Point site
What we did: Read our cached copy of the publisher (https://startupfortune.com/hut-8-and-mara-shares-plunge-as-bitcoin-slips-under-60000-and-ai-stocks-sell-off/) in full (8,942 characters, retrieved November 22, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Hut 8 and MARA shares plunge as bitcoin slips under $60,000 and AI stocks sell off - Startup Fortune
Quote: “with a second lease of the same size that fills the 1 GW site”