Expected capacity increase to 21 EH/s
Company: IREN
The claim, verbatim
The Company expects to increase its installed capacity to 21 EH/s through optimization of existing data center infrastructure in the coming days.
Source (primary)
IREN 6-K filed 2024-09-23 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Through optimization of its existing data center infrastructure, the Company now expects to increase its installed capacity to 21 EH/s in the coming days”
How we checked this
Checked on September 17, 2026. The cited source supports every part of this claim.
The filing states that optimizing existing data center infrastructure is expected to raise installed capacity to 21 EH/s in the coming days.
Confirmed in the source:
- Iris Energy Limited (IREN) expects to increase its installed capacity to 21 EH/s
- The increase is to come through optimization of existing data center infrastructure
- The increase is expected in the coming days, as of the September 23, 2024 filing
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1878848/000187884824000014/a6-kcover.htm) in full (1,828 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN 6-K filed 2024-09-23
Quote: “Through optimization of its existing data center infrastructure, the Company now expects to increase its installed capacity to 21 EH/s in the coming days”