Total capacity after Childress Phase 1
Company: IREN
The claim, verbatim
Total capacity across Canada and the USA will reach 260MW and an estimated 9.1 EH/s once the 80MW under construction at Childress is complete; the 80MW is estimated at 3.5 EH/s assuming purchase of S19 XP miners.
Source (primary)
iren 8-K exhibit (ef20012021_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-18)Live source ↗
Quote: “Total (Canada & USA) 260 9.1”
How we checked this
Checked on November 20, 2026. The cited source supports every part of this claim.
The site capacity table shows 260MW and 9.1 EH/s in total once the Childress 80MW is included. A footnote ties the 3.5 EH/s estimate for that 80MW to buying S19 XP miners.
Confirmed in the source:
- Total capacity across Canada and the USA is shown as 260MW and 9.1 EH/s including the 80MW under construction at Childress
- The 80MW under construction at Childress is estimated at 3.5 EH/s
- The 3.5 EH/s estimate assumes purchase of Bitmain S19 XP miners
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036123047077/ef20012021_ex99-1.htm) in full (23,783 characters, retrieved November 18, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20012021_ex99-1.htm)
Quote: “Total (Canada & USA) 260 9.1”